Design Service Process
度身訂造平面設計圖提案

Step1: Tailor-made Graphic Design Proposal Consultation on requirements

  • Consultation on requirements

    After understanding the clients’ basic information, personal habits and design criteria, a preliminary consultation can be launched.

  • Discussion in detail

    Meeting face to face to discuss drafts on design ideas and proposals.

  • Signing the design contract

    Once our clients have consented to the design content and quotations, we can sign the agreement contract.

度尺及檢驗

Step2: Measurement and Inspection

  • On-site inspection

    After signing the contract, we can discuss the needs with our clients and suggest recommendations for them with the precise measurement on hands.

  • Occupational Therapy Report

    The report is tailor-made based on our clients’ needs after evaluation with our occupational therapists.

設計提案及會議

Step3: Design Proposal and Conference

  • Design Proposal

    According to original floor plan and furniture diagram, we suggest the following three types of design proposals:
    1. Amendment on the spacing design of the housing unit to lower the size of wooden furniture and lower the cost at the same time<
    2. Elderly-friendly design. We focus on elderlies’ needs to make a big difference on your home, no matter how much budget you have prepared
    3. Prepare for the worst. Based on the evaluation report provided by occupational therapists, our designs not only focus on your current needs to make changes in spacing, but also focus on elderlies’ potentially facing problems.

  • Design Conference

    Two design conferences are included. We will make the final decision choosing from the design proposals. After signing the second-staged contract, we will continue our design and renovation procedures.

立體設計圖

Step4: 3D design diagram

  • Drawing diagram

    We are going to provide six to eight digital designed diagrams (based on scope of design), illustrating the design details clearly. Using a three-dimensional diagram to simulate the real picture of the housing unit.

  • Drawing full picture

    Each expected results after construction is shown on the drawings in details.

  • Facilities proposal

    Based on occupational therapists’ evaluation reports, we recommend the most suitable assistive devices and facilities for our clients, ranging from metal fitting, lighting devices, sanitary appliances and large furniture.

制定裝修工程流程

Step5: Drafting the flow of renovation project

  • Construction Quotation

    Signing the construction contract with our clients in order to begin the construction

  • Choosing construction materials

    Designers are going to choose the most appropriate construction materials after explaining the qualities of materials with our clients

  • Setting up a buy list

    We are going to list the brands, amounts and prices of each items we are buying for our clients’ reference

工程階段 - 製定傢私及施工圖

Step6: Construction Stage: Setting up furniture and construction diagrams

  • Signing construction contract and doing preparation work

    After signing the construction contract with us, we are commissioned to fill in the construction application form and insurance before the construction starts.

  • Starting the construction

    Detail arrangement on demolition, plastering, installing doors and windows, carpentry, varnishing, installing glass and on-site monitoring.

  • Regular on-site monitoring

    Construction consultants are going to update the construction status with our clients regularly, also taking records and shooting construction situations to ensure the construction is on schedule.

驗收及交收

Step7: Final check

  • Final check

    Washroom: Waterproof and bathing tub test
    Drainage: Water pressure test
    Home appliances: Hand-delivering maintenance instruction booklet

  • End of construction and Delivery of Possession

    Cleaning up after all the construction works and returning the key after final check with our clients.

  • Maintenance and occupational therapists’ revisit

    We provide half-year construction warranty.
    In order to provide suggestions on usage of facilities and home recovery exercise, occupational therapists will visit the housing unit again within one week after the construction completed,